Success Cases
Phase 1 of the New Model 3 Front and Rear Hood Project at Tesla Shanghai

Project Name: Phase 1 of the New Model 3 Front and Rear Hood Project at Tesla Shanghai

Project Location: Shanghai

Customer Standard: Sicar Standard

Production Line Information: Primarily produces front and rear hoods, fenders, and other components for the Model 3

Takt Time Requirement: 56 seconds

OEE Requirement: ≥85%

PLC Brand/Model: Siemens S1500 Series Safety CPU

PLC Software: TIA Portal V16

Main Processes: Resistance Welding (Fixed Welding + In-Air Touch-Up Welding + Spot Welding), Arc Welding (MIG/MAG Welding), Handling, Adhesive Application, Riveting, Vision Inspection, Beading, Laser Welding



A technology-based enterprise integrating education and industry, specializing in the research and development of intelligent equipment, smart manufacturing technical services, and talent cultivation.

COPYRIGHT © 2026 Anhui BOOL Automation Engineering Co., Ltd. ALL RIGHTS RESERVED 皖ICP备2025084482号 POWERED BY SUNCHER.COM