F70147 Changxing Hybrid Transmission Sub-assembly Line

Project Name: F70147 Changxing Hybrid Transmission Sub-assembly Line

Project Location: Changxing, Huzhou

Customer Standard: Geely New Electric Drive Standard

Production Line Information: Geely Hybrid Transmission (Changxing)

Takt Time Requirement: 45 seconds

OEE Requirement: 98%

PLC Brand and Model: Siemens S1500 Series

PLC Software: TIA Portal

Main Processes: Press-fitting, Tightening, Heating, Leak Testing, Measurement